Wednesday 14 October 2015

Weaving The Q'eswachaka Bridge

Every year, local communities on either side of the Apurimac River Canyon use traditional Inka engineering techniques to rebuild the Q'eswachaka Bridge. The old bridge is taken down and the new bridge is built in only three days. The bridge has been rebuilt in this same location continually since the time of the Inka.



YouTube link

(thanks Cora)

0 comment(s):